Godfrey Bloom: The whole wind turbine game is a SCAM – The Expose
A 2-megawatt wind turbine requires 200 tonnes of steel, which needs 300 tonnes of iron and 170 tonnes of coking coal. The coal, and other raw materials, have to be mined and transported by hydrocarbon-powered transport. Until it is no longer working, a wind turbine could spin for years and it ..
https://expose-news.com/2024/10/02/the-whole-wind-turbine-game-is-a-scam/
In response Robert Wakefield to his Publication
These custom https://emojikitchen.io aren't limited to a simple overlay—each combination is thoughtfully designed to create something entirely new, like a crying laughing face merged with a cowboy hat or a melting ice cream paired with a heart.